Super Cell Fender, Arch Fender and Cast Steel Pillar Bollard for Kribi Deep Sea Port in Cameroon, Africa (JSC、JBP)

Inquire

JIER Marine won the bid for Construction of The Basic Infrastructure of Phase Two of The Kribi Deep Sea Port Project at 2023. Kribi Deep Sea Port is located on the Atlantic coast some 285 km from the capital Yaoundé. It is strategically positioned in the center of the Gulf of Guinea and is surrounded by the 262 square km Kribi Industrial Area, destined to host new industrial and logistical developments. The owner of this project is Cameroon Ports Authority and the EPC is China Harbour Engineering Company.

Super Cell Fender, Arch Fender and Pillar Bollard

JIER Marine supplied big quantity of JSC2000H Super Cell Fender System with 2m Height, JDA300x2850 Arch Fender System and JBP200 Cast Steel Pillar Bollard for this project.

JSC2000H Super Cell Fender approved by PIANC 2002 and BS 6349-4:2014 is a customized big size rubber cell fender along with customized 3560x3580 steel panel for the marine fender system as the full package. According to the specifications of different projects, JIER Marine can design and produce different sizes of steel panels to make sure the rubber fender system can be protected effectively and meanwhile to maintain a lower hull pressure.

The JDA300x2850 Arch Fender System for this project is composed by arch rubber fender and rubber ladder. It’s a ladder fender system that can not only prevent the quay from colliding but also facilitate the work of staff to climb with a competitive cost.

JBP200 Cast Steel Pillar Bollard is one of the biggest standard pillar mooring bollards from JIER Marine. This type of marine bollard can be placed on jetties where vessels berth on both sides of the jetty structure due to their 360-degree line of load range.